TerraCog Global Positioning Systems: Conflicts and Communication on Project Arial
WAC Assignment 2
Submitted to
Prof. Rohini Patel
Submitted by
Vishnu Meena
Roll No-111061
On
25 November 2011
Indian INSTITUTE OF MANAGEMENT UDAIPUR
Letter of Memorandum
Date: 20-03-2008
To,
Richard Fiero, President
Tony Barren, Director of Production
Ed Pryor, VP of sales
Allen Roth, Director of Design & Development
Becky Timmons, CFO
Harold Whistler, VP of Design & Development
From: Emma Richardson, Executive Vice President
hither is the report on the problem of launch of the harvest-feast and equipment casualty of the product. I recommend launching the product at null margin and then redesign to reduce the product.
Executive heavyset:
Designing Department of TerraCog is come up with a product called Aerial. Price estimated by the excogitation department is too high. They have four options either to go with the price of designing team or to launch the product at cipher margin and redesign it to reduce cost or handle the launch by 3 to 6 months or by abandon the project. On the basis of these options launching the product at zero margin and redesign it to reduce the cost is the optimum recommendation.
Word used: 85 words
Content Page:
1. seat Analysis â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦ 4
2. The problem / Objectiveâ¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦.. 4
3. The optionsâ¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦... 5
4. Criteria for Evaluation â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦.. 5
5. Evaluation of survival of the fittestâ¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦... 5
6. Recommendationâ¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦. 6
7. Action Planâ¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦â¦ 6
Situation Analysis:
TerraCog was a privately held company specializing in high-quality GPS and fishing sonar equipment. They are...If you essential to get a full essay, order it on our website: Orderessay